First Article Inspection for Injection Molding: Buyer Guide

Dimensional first article inspection report for injection molded part — Deuchi Plastic

Releasing production without a solid first article inspection injection molding package is how line-down starts on week one. FAI proves the process — not just that T1 samples looked good on a bench.

What FAI should include for molded parts

  • Full dimension report on drawing CTQs
  • Material certificate of conformance (grade, lot)
  • Process record: machine, mold version, cycle parameters
  • Cosmetic sign-off against agreed master
  • Corrective action closure on any out-of-spec dims

Align with broader quality scope in our PPAP / FAI guide.

FAI vs T1 — buyers confuse them

EventPurpose
T1 / T0 samplesTool tryout, design validation
FAIProduction process capability sign-off

Approving T1 does not replace FAI at production setup — different machine, operator, or resin lot can shift dimensions.

When to reject FAI

  • CTQ out of band without approved deviation
  • Material lot undocumented
  • Cosmetic class failures on A surfaces
  • Missing insert torque or weld test records when specified

FAQ

Is AS9102 required for industrial OEM?

Only if your customer mandates it; many industrial programs use a simplified dimensional FAI.

Who pays for re-FAI after engineering change?

Define in PO — customer-driven changes usually customer-funded.

Next step: Define FAI scope in your next contract manufacturing RFQ.