Contract manufacturing is the strategic partnership where you, the OEM, leverage our full-scale manufacturing capabilities. We take responsibility for sourcing materials, molding, assembling, and delivering complete, ready-to-use products or sub-assemblies. This allows you to redirect your focus and resources to core business drivers like innovation, marketing, and business growth.
Assorted plastic injection molded parts including housings gears and industrial components on inspection table

How a program runs

You are not buying a machine list. You are buying a decision before steel: mold, BMC or SMC, thermoplastic injection, or machining if volume cannot pay for a tool. After that we run the process we named — secondary ops only when the next station needs them. Updates are dates and blockers, not “no problem.”

From a live program

An LV electrical OEM moved a fuse housing from hand assembly to a robot line. The cover would not close. We recut the spring groove and held it to 0.01 mm. The cell hit 8,000 pieces a day. We did not rewrite their line. We changed the part so the line could run.

— Fuse housing program · Applications case

What you leave with

Not “a partner.” A named process, a named CTQ, and a daily rate the next station can hold.

  • A process call, in writing

    DFM before the tooling PO: mold, compound, or machine. Including when we tell you not to cut steel.

  • Tool and shot on one program

    Mold build and production under the same quality plan. Steel, resin or BMC, and the features that fail assembly stay on one drawing.

  • Ops the station needs

    Inserts, assembly, kitting — or CNC when annual volume cannot amortize a mold. We do not add steps to look complete.

  • Dates, not mood

    T0 / T1, first article, and the daily rate. If a blocker shows up, you get the blocker — not a status slide.

Written gates. Not a photo album.

  1. 01 DFM Review drawing
  2. 02 Steel Cut the mold
  3. 03 T1 Measure sample
  4. 04 Production Run the press